MIVAN Inventory Protocol (Dispatch Process)
- Prior to sending the materials, soft copy of codified inventory list of each consignment is required to be sent to the centralize system formwork cell and receiving site.
- After checking of quantities of packing list with details, and further authentication from centralized yard and receiving site, the materials will be dispatched to receiving site.
- Before dispatching of materials, requirement of receiving site and packing list must be verified by centralized system formwork cell.
- Before dispatch of materials, all the materials must be segregated component wise and cleaned properly (free from concrete).
- During the dispatch of materials, the damaged or off cuts materials will not be dispatched to required sites.
- While loading of materials to commercial vehicles, the materials must be loaded component wise and numbered as total number of components.
- All the materials should be dispatched through weigh tonnage.
- The hard copies must be sent along with the vehicles and materials.
- Off cut panels special components will be dispatched to central yard and during the dispatch, the challan must be electronically generated.
- Before selling of scrap, a personnel from centralized yard must inspect the site scrap and damaged materials.
This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT Privacy & Cookies Policy